DynamiaDynamia
Back to tools

HAMi GPU Asset ROI Calculator

Compare the effective value of the same GPU investment under no HAMi, HAMi OSS and Dynamia Enterprise for HAMi, with adjustable market and data-center assumptions.

Quick scenarios:
Select GPU vendor and model
Number of GPUs1,000 GPUs
Unit price (adjustable)16,000
Current average utilization (no sharing)25%
HAMi OSS expected utilization (40% cap)35%
Dynamia Enterprise for HAMi expected utilization (80% cap)70%
Advanced TCO parameters (servers, power and electricity)
On-premises model: electricity = (GPU power × load factor + server base power) × PUE × 8,760 hours × electricity price. Use rack fees separately for colocation or rented IDC capacity.
5-Year TCO On-premises DC
GPU $16M + Servers $4.25M (125) + Network/Storage $2.43M + 5y Power $2.87M
$25.55M
Three Options · Effective Output
Same hardware spend — how much asset value each option actually activates
25%
No HAMi
$6.39M
Dedicated GPUs · assets dormant
Covers first 200 GPUs only
27%
HAMi OSS
$6.9M
First 200 GPUs to 35%
Other 800 GPUs stay at 25%
Recommended
70%
Dynamia Enterprise for HAMi
$17.88M
Expected to 70% · Unlimited scale
Enterprise cap 80%
OSS cap 40%
No HAMi
Dedicated GPUs · status quo
25%
Actual utilization
—
No sharing
$6.39M
Effective output
  • One job per GPU, massive idle
  • No memory/compute sharing
  • Scaling means buying more
HAMi OSS
CNCF Incubating · Free
40%
Utilization cap
Exceeded
200
GPU scale cap
$6.9M
Effective output
  • vGPU slicing · memory/compute isolation
  • Best for fleets ≤ 200 GPUs
  • Community support, no SLA
  • 1,000 GPUs exceed the OSS capacity cap
Best
Dynamia Enterprise for HAMi
Dynamia AI · Commercial support
80%
Utilization cap
Unlimited
GPU scale · 10k+
$17.88M
Effective output
  • Memory oversubscription (UMI) · elastic scaling
  • Multi-cluster management · enterprise SLA
  • 24×7 expert support
Direct Savings from Higher Utilization
Same workload — resources no longer needed after utilization rises from 25% (GPU + servers + power & cooling):
HAMi OSS@ eff. 27%
Frees 74 GPUs · 9 servers
GPU purchase$1.18M
Servers$306K
Network / Storage$178.8K
5-yr electricityrecurring$209.84K
Total equivalent savings$1.88M
Dynamia Enterprise for HAMi@ eff. 70%
Frees 642 GPUs · 80 servers
GPU purchase$10.27M
Servers$2.72M
Network / Storage$1.56M
5-yr electricityrecurring$1.84M
Total equivalent savings$16.39M
≈ 41.0× the Enterprise software cost ($400K)
Equivalent savings compare resource footprints at the same workload. Realized as: deferred purchases, retiring older GPUs, freeing capacity for new workloads, or reducing rented capacity. Electricity savings recur annually (on-prem DC scope).
Value created by Dynamia Enterprise for HAMi
Dormant asset value unlocked vs. no HAMi
$11.5M
Even vs. free OSS: extra cost $400K, extra value $10.99M, net gain $10.59M (27.5×)
Avoided purchase: same output without HAMi would require +1,800 more GPUs (incl. servers & 5-yr power, ≈ $45.98M) — Enterprise delivers it on your existing fleet
Enterprise software cost (est.)
$400K
Return on investment
28.7 ×
Payback period
2.1 months
Calculation assumptions

OSS boundary: The model assumes a 40% utilization ceiling and full coverage for up to 200 GPUs. Capacity beyond 200 GPUs remains at baseline utilization.

Enterprise model: The model assumes up to 80% utilization with large-scale scheduling, multi-cluster management and enterprise support. Actual improvement depends on workload mix and operational maturity.

TCO scope: Five years of GPU, server base, network/storage and electricity costs. It excludes staffing, facility construction, residual value and colocation rack fees. Enterprise cost is estimated at 2.5% of GPU hardware investment; actual pricing varies by deployment.

Image viewer